Foreword
The main extensive use is manufacture to metallurgy , railroad , oil field , machine and electrical machinery and so on much businesss the BGJ's set reaction heating apparatus , and in the inflexible process requires to service bearing , coupling , gear and bushing and so on which suit packed hoop shape Kong Xing spare parts reactions to heat .

The BGJ's set heating apparatus adopts the electromagnetic induction rule , and shall be processed the secondary that the warmhearted work is the coil , and serves as circular telegram queen being heated the work to be living below the induced current action , and through liner and form coming into being thermal expansion , to meet to be filled with the necessaries of fitting thus .
1 , lift the fitting quality , and heat uniformly and accuracy Gao Neng to cause the intrinsic quality of surperficial hardness of work unchangeable .
2 , lifing work efficiency , it is swift to heat velocity , and be able to cut down worker's labour intensity , and lift the fitting rate of aduance once more , and attains the culture to give birth to .
3 , the composition is rightful and well-developed and it is simple and convenient and safe and reliable to manipulate and does not there is not fire alarm peril .
4 , practise thrift the energy resources , cut down the cost and lift the beneficial result , and against oil heats to be contrastd a length oil 100% and electrothermal oven to be contrastd a length electricity 60% .
5 , BGJ's set reaction heating apparatus is living to heat to cease queen , and deficient magnetism retreats to cease under the 3CS in shall doing voluntarily , and accords with ZJS-004's criterion , and the BGJ's set reaction heating apparatus is that the culture gives birth to and the unit is heated to the high efficiency manufacture and safe production ideal .

BGJ-2.2-2's mould bearing heating apparatus

Summarized account
BGJ's set online part of the body of 2.2-2's mould heating apparatus control unities to be living one series the portable produce is applicable the warming up suit the packing use of littleer work . Have that the bulk is little and weight is light and removes the convenient strong point . The shell adopts the insulating material to make , and is safe and reliable in the use process .
That heating apparatus adopts the time control , time may be living that 0-99 chooses inner place the branch limit , may equip distinct standards yoke iron on the basis of consumer's work size , selecing being similar standard dimensions yoke iron against the work bore diameter when use , it is optimum to heat work rate of heat like this .

One , the operation use means :
1 , putting through 220 Vs and interchanging the heating apparatus plug , the revolutionary light of instruction shines .
2 , being living , the yoke is put on the work on the iron , and suppresss placeeing the unalterable rush pith end face of heating apparatus on . ( catching sight of the picture )
3 , incites to action time pokes the plate to poke up time that needs the place , according to " switchs on " the push-button , heats to start .
4 , time reachs the primary return to cut off .

Two , pay attention to the matter
1 , use yoke iron ought to be pay attention to putting down gently , strictly forbids ruing into , severely heats , ought to properly in the interest of assure when temporarily not emploing , and lays up inner place the box , discovery face spoilts by rust not smoothly ought to without delay polish once more square may emploing , so as not to ading the noise .
2 , bans the unalterable rush pith does not there is not yoke iron on the end face , according to " switchs on " the push-button when heating the work .
3 , the work is heated once not to reach meeting the fitting necessaries , and may prolong the warm-up period .

BGJ-3.5-3 and BGJ-7.5-3's mould bearing heating apparatus

Summarized account
BGJ's set 3.5-3 and BGJ7.5-3's mould bearing heating apparatus adopts time and two kinds of the temperature heats the control mode .
Time dominate the explicit formulation . Yet the comprehension work audio-visual warm-up period , time the error was smaller than 5% in per minute .
Temperature control is chiefly used a monitoring to employ .
That engine packs the platform truck , and is convenient for the going from place to place use of manufacture space .
That heating apparatus warm-up period may be living that 0-99 chooses inner place the branch limit .
Heating the temperature may be living that 0-399 recruits inner place the limit .

One , the operation use means :
1 , take the heating apparatus power source string on 380V's AC supply .
2 , turns yoke iron gos up and down the laddle , and raises behind the yoke iron by the work suit being living on the yoke iron either suppresssing to place suit to be living the upright post liner of unalterable rush pith . In immediate future catchs sight of the picture one and picture two , afterwards revolve back the home position to drop down to start heating .
3 , fixs the control mode , adopts time dominate to poke the temperature plate to shift till the largesttest , the sensor is craneed one's neck to lay up one side need not , incites to action time pokes the plate pokes till requires warm-up period , in immediate future starts work according to " heating " the push-button , when adoping the temperature control mode to heat the work , incites to action time pokes the plate to poke till the largesttest , in immediate future the temperature is fixed till the bureau and is requireed to heat the temperature , pushes down down " heating " the push-button to start work . ( the probe is adsorbed the work end face on by the sensor ) .
4 , time reachs either the temperature , cuts off in the primary return , and completees the degauss movement , and turns ging up and down the laddle , and turns yoke iron taking off the work installation .

Two , the matter is pay attention to :
Whether to pay attention to the tension electric current when 1 , power hook-up tallys with , machinery grounding .
2 , adjust the weightier work suppresss placeeing when the unalterable upright post of rush pith of machinery , ought to be living on the mesa to plus to place the asbestos board , and guard against the temperature from overtopping , and burns out the butt plate , and the injury works .
3 , when the ordinary bearing is heated the temperature does not overtake 120 s , in case when going beyond 150 s adopts to the full time the control mode , averting the temperature to overtop , the breakdown sensor is craneed one's neck .

BGJ-20-3 , BGJ-60-3 and BGJ-75-3's mould bearing heating apparatus

Summarized account
BGJ's mould reaction heating apparatus consists of leader and control box two sections . This engine consists of the unalterable rush pith coil , the unalterable rush pith crossarm gos up and down the organization , the control mode possess time and temperature duplex control to the flexible rush pith post ( catching sight of the picture one and picture two ) , adopts completely integrated of the import numeral to display , jockey be able to the realization warm-up period and heats the temperature .

One , the operation
1 , according to nameplate power hook-up ( two one another 380V's alternating current ) .
2 , the control box coil out is put through the leader input header .
The revolutionary light shines the 3 , start control box ship mould master switch .
4 , turn the handwheel , and lift yoke iron revolveing 90 s , and lays up heating the work . The rush pith post is chooseed in the opening on the basis of the work , and lays up inner place the work Kong Zhong , and turns yoke iron till the former place , and turns the handwheel , and causes yoke iron closely contact against the rush pith post . That produce will place suppresss a use , is getting near the taut degree to act as appropriately in order to shift till the noise minimal .
5 , when first heating the work , incites to action time pokes the plate pokes till requireing warm-up period , incites to action time pokes till the largesttest , the use is fathomed that Wen Ji surveys the work temperature , when attaiing the temperature , bears in mind secondly time , in order that emploing next . ( fathoming Wen Jiling matchs somebody with somebody )
6 , heats up hour the green light putes out , the revolutionary light shines , and heating completees the degauss movement moreover , and wears the asbestos gloves taking off the work installation .

Two , pay attention to the matter
1 , it ought to be examineed whether the supply voltage tallys with against the heating apparatus nameplate , whether grounding is well when energizeeing .
2 , heating apparatus yoke iron together with unalterable rush pith end face have to contact well , and burn out coil group and the electrical equipment element so as not to coming into being noise either great electric current overload .
3 , the mesa ought to be extend one tier of asbestos board on the plank , and in order to provide against the work is overheatedly roastd the scorched mesa plank .
The 4 , work as to the particular standard dimensions need be turn upside down up and down two times heating .

BGJ's set main performance parameter list of bearing heating apparatus

Standard type

BGJ-2.2-2

BGJ-3.5-3

BGJ-7.5-3

BGJ-20-3

BGJ-60-3

BGJ-75-3

Meritorous service rate

2.2KVA

3.5KVA

7.5KVA

20KVA

60KVA

75KVA

Work tension

220V ~

380V ~

380V ~

380V~

380V ~

380V ~

Rated current

20A

20A

40A

60A

160A

180A

Method of control

Time 0-99's branch

Time 0-99.9's branch

Time 0-99.9's branch

Time 0-999 second

Time 0-999 second

Time 0-999 second

Reference in bore diameter

is 30- 80

is 70- 120

is 100- 170

is 160- 230

is 230- 300

is 300- 900

Work breadth the maximum

120mm

170mm

180mm

220mm

280mm

350mm

Heat the temperature the maximum

250 s

250 s

250 s

250 s

250 s

300 s

Annex

Crane one's neck 1

Crane one's neck 1

Whole set gross weight K G

50

80

15

300

500

80

External form packing dimensions

550 s are 400 s 320

750 s are 500 s 950

800 s are 550 s 1000

1500 s are 800 s 1300

1850 s are 980 s 1250

1850 s are 980 s 1250


Produce type

Bearing shop sign

Warm-up period

Heat temperature

Bore diameter measurement

BGJ-2.2-2's mould

309

1 minute 20 seconds

120 s

0.07MM

BGJ-3.5-3's mould

320

4 minutes 30 seconds

120 s

0.15MM

BGJ-7.5-3's mould

2328

6 minutes

120 s

0.12MM

BGJ-20-3's mould

3620

6 minutes

120 s

0.16MM

BGJ-75-3's mould

Since fix on the basis of consumer's work , weight and thickness


Type together with standard

Bore diameter

Outside diameter

It is high

Weight

May heat the work name

BGJ-20-3

is 60- 500

560

220

150

Bearing

BGJ-60-3

is 80- 600

700

250

500

Compound metal vane wheel and large gear

BGJ-75-3

is 90- 800

1000

250

500

Large coupling and gear

Close down by window

© Copyright 2002-2012, 扬子工具集团有限公司 版权所有。电话:0523-86860853、86860243
全球扬子工具: 轴承感应加热器 电动试压泵 拉马 液压千斤顶 液压弯管机 工具网 bearing heater